The general objective of the project “Rehabilitation of the Northern Road – Maramureș, stage I”, financed by the Regional Operational Program 2014 – 2020, has a total length of 72.758 km and is composed of the following roads and county road sectors:
>> DJ108D, Sălaj – Gârdani county border (DJ108A);
>> DJ108A, Gârdani – Ardusat;
>> DJ193, Satu Mare county border – Hideaga;
>> DJ182B, Coaș – Șomcuta Mare;
>> DJ182C, Coaș – Copalnic – Copalnic Mănăștur – Șurdești.
Results
The rehabilitation works will be carried out on the current existing route of the county roads and provide for actions to improve the relevant parameters: increasing speed, road safety, load-bearing capacity, etc.
The main works carried out within the rehabilitation project are:
>> Restoration of the road structure: A reinforced road system with cassettes was adopted along almost the entire length of the road in the areas of widening, and a new road system was provided in the areas where the existing road structure is not adequate;
>> Works for collecting and evacuating rainwater: ditches and gutters construction works; unclogging ditches and footbridges;
>> Development of accesses to properties and side roads;
>> Development of bus stops and parking lots; cobblestone sidewalks;
>> Development of railway level crossings;
>> Rehabilitation of bridges and footbridges;
>> Consolidation works;
>> Restore areas with foundation failures;
>> Works for traffic safety: horizontal signaling (road markings) and vertical (installation of signs); installation of protective parapets.
The project also includes rehabilitation works of the road bridge over the Someș River on the county road DJ193 in the town of Ardusat in a length of 238m and of the 2 unloading bridges in lengths of 66m and 38m, respectively. The project also includes works to redevelop the railway level crossing (Dej – Baia Mare) on the county road DJ193 in the town of Hideaga.
Total value: 231,545,894 lei.