Modernization of the Bucharest North – Henri Coandă International Airport railway line

>>  Supervision

PROJECTS THAT GIVE SHAPE TO THE VISION.
RESULTS THAT SPEAK FOR THEMSELVES.

Modernization of the Bucharest North – Bucharest Henri Coandă International Airport railway line, Phase I: Connection c.f. at Terminal T1, Henri Coandă Bucharest International Airport” is a benchmark project for the Romanian railway system, intended to ensure the compatibility of the Romanian railway infrastructure with the trans-European transport infrastructure, by interconnecting the Airport with the entire Romanian railway network and with the European TEN-T transport network.

Specific objectives

>>   Ensuring a direct connection between Bucharest North Railway Station and Henri Coandă International Airport by building a 2.95 km long double railway, a 1.52 km viaduct that will cross DN1, three footbridges, an electronic centralization installation and a passenger station at Terminal T1.

>>   Increasing the quality of public passenger transport services, by introducing scheduled trains into circulation, with a frequency favorable both for passenger transport to and from the airport, but also for commuter passenger transport to and from the Capital.

Value total: 420,113,085 lei, excluding VAT.