Rehabilitation of the Brașov-Simeria railway line, component of the Pan European Corridor IV

>>  Supervision

PROJECTS THAT GIVE SHAPE TO THE VISION.
RESULTS THAT SPEAK FOR THEMSELVES.

Consultancy in the field of execution management and for the verification of the execution of construction and installation works, related to the objective of “Rehabilitation of the Brasov-Simeria railway line, component of the Pan European Corridor IV to ensure the circulation of trains at a speed of 160 km/h”, on the Coslariu-Simeria section – Lot 1

We know very well how important transport infrastructure is, an indispensable facility for modern life and we recognize its value for society and communities. Therefore, through the development projects of integrated transport systems, KONSENT establishes connections between people and places and facilitates economic exchanges. At the same time, we seek to respond to all functional, social and economic requirements by integrating our solutions harmoniously into the natural environment.

Through the contract “Consultancy in the field of execution management and for the verification of the execution of construction and installation works on the Coslariu-Simeria section – Lot 1”, we carry out planning, consultancy, technical assistance and management activities in the development of the transport infrastructure of Alba and Hunedoara counties. The rehabilitation of the section will increase the degree of safety and comfort and will reduce train travel time as well as the transport time of goods.

Within the framework of this project, consolidation and rehabilitation works of bridges and footbridges are carried out, new bridges are built, electrification and energy supply works are carried out, as well as works related to the telecommunications network. Also, execution works are carried out for signaling installations and the platforms are rehabilitated. At the same time, infrastructure development works for people with disabilities are carried out.

The objective of the project is to modernize 74.43 km of railway on the mentioned section, so that passenger trains can travel at a maximum speed of 160 km/h, and freight trains at a maximum speed of 120 km/h. Thus, the aim is to meet the standards of the European Agreement on major international combined transport lines and related facilities.

The value of the rehabilitation project on the Coslariu – Simeria section exceeds 300 million Euros, the project being co-financed by the European Commission through the Transport Sectoral Operational Programme 2007-2013. 85% of the funds are provided by the European Commission through the Cohesion Fund – non-reimbursable funds – and the remaining 15% come from the state budget.

The project is part of Priority Axis no. 1 “Modernization and development of the TEN-T Priority Axes with the aim of developing a sustainable transport system and its integration into the EU transport networks”, Major intervention area 1.2 “Modernization and development of the railway infrastructure along the TEN-T Priority Axis 22”.