Implementation of the selective collection system and arrangement of the transfer station in the Turceni City area

>>  Project management

PROJECTS THAT GIVE SHAPE TO THE VISION.
RESULTS THAT SPEAK FOR THEMSELVES.

General objective:

The general objective of the project is to stimulate the selective collection process and promote methods to reduce the amount of waste deposited in order to rehabilitate the environment and increase the volume of investments attracted in Oltenia.

Specific objectives:

>>   Implementation of a selective collection and recovery system of recyclable materials, in order to reduce the amount of waste deposited in the area of ​​the city of Turceni and neighboring localities;

>>   Improvement of the waste collection, storage and transport system in the city of Turceni.

Results:

>>   Increase in the level of waste collection from 0% to at least 85% in rural areas during the period 2009 – 2011;

>>   Increase in the number of beneficiaries of the public sanitation service from 2,053 currently to at least 23,700 by the completion of the project;

>>   Increase in the amount of recyclable waste recovered by at least 250 t during the period 2009 – 2011;

>>   Reduction in the amount of waste deposited from the target area by at least 200 t during the period 2009 – 2011;

>>   Increase in direct jobs by 20 as a result of the project implementation;

>>   Increase in the percentage of beneficiaries satisfied with sanitation services by at least 25% in 2010 compared to 2006;

>>   50 newly created jobs;

>>   53 people trained to exploit the investment, within 3 months;

>>   1 advertising, awareness and promotion campaign;

>>   3,500 beneficiaries of the promotion campaign in 4 months.

Services:

>>   Consultancy in the preparation of the award documentation and in the organization of the procurement procedure for design services;

>>   Consultancy in the preparation of the award documentation and in the organization of the procurement procedure for works;

>>   Consultancy in the preparation of the award documentation and in the organization of the procurement procedure for goods;

>>   Consultancy in the preparation of the quarterly reports;

>>   Consultancy in the preparation of interim and final payment requests.

Total value: 942,753.79 euros.