Rehabilitation of DJ 182B, Coaș sector – Remești pe Someș

>>  Supervision

PROJECTS THAT GIVE SHAPE TO THE VISION.
RESULTS THAT SPEAK FOR THEMSELVES.

County road 182B crosses from north to southwest the central region of Maramureș County from Baia Mare municipality to the border with Satu Mare County and has a total length of 69.100 km.

The county road sector 182B subject to rehabilitation ensures the connection of the north of the county with the trans-European road transport network (DN1C) and has a length of 14.366 km, ranging from km 26+900 (int. DN 1C) to km 41+266. The road sector crosses the localities of Șomcuta Mare (DN 1C), Tulghieș, Mireșu Mare and Remeți pe Someș and is expected to be connected to the bridge over the Someș River in Ulmeni, which is currently under construction. This road intersects with other classified public roads: DN 1C ((Dej – Baia Mare), DC 82 (towards Iadăra), DJ 108E (towards Hideaga).

Specific objectives:

The main works to be carried out within the DJ182B road rehabilitation project are:

>>   Restoration of the road structure: A reinforced road system with cassettes was adopted along almost the entire length of the road in the areas of widening, and a new road system was provided in the areas where the existing road structure is not adequate;

>>   Works for collecting and discharging rainwater: works for arranging ditches and gutters; unclogging ditches and footbridges;

>>   Arrangement of a level crossing with the railway;

>>   Arrangement of accesses to properties and side roads;

>>   Arrangement of bus stops;

>>   Consolidation works;

>>Restoration of areas with foundation failures;

>>   Rehabilitation of bridges and footbridges;

>>   Works for traffic safety: horizontal signaling (road markings) and vertical (installation of signs); installation of protective parapets.